kings-bay-dry-dock
- Facts and Figures
-
Estimated Completion July 2023
$600,000,000
- Delivery Method
- General Contractor
Estimated Completion July 2023
$600,000,000
The project includes repair to dry dock superstructure, panel replacement, steel caisson repairs, bridge crane repairs, mechanical and electrical system repairs, ancillary building repairs, and incidental related work. This project includes work to be performed in three construction phases (A, B, and C).
Phase A consists of creation of a contractor "free zone" for use during construction, construction of temporary facilities to accommodate relocating the TRF out of the WRA, and procurement of long lead time items to accommodate Phase B.
Phase B consists of performing all work that can’t be performed with a submarine in the dry dock. This phase includes:
Phase C consists of completion of work that can be completed with a submarine in the Dry Dock, removal of the free zone, and removal of temporary infrastructure installed in phase A.
07.16.2021 /// dvids
Ceremony Held for Second Phase of NSB Kings Bay Dry Dock Project